Millner Ave, Horsley Park

Ausgrid

The project in Horsley Park required building a substation next to an existing one. This is usually a straight-forward design, however there was a problem safely earthing the substation with no common-earthing available in the area. The solution was to create a custom earthing plan to bond new earthing into the existing seperate-earthing of the existing substation. By connecting into an existing earthing network, the space required for the substation could be reduced, and any faults could be safely managed.